China Wholesale Cold Heading Mould Manufacturers - Protective Sheath Built up Die – Nisun

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our enterprise since its inception, often regards solution excellent as enterprise life, continually strengthen output technology, enhance product high quality and continually strengthen organization total high-quality administration, in strict accordance using the national standard ISO 9001:2000 for Tungsten Tool, Cutting Tungsten, High Precision Thread, To learn more about what we can easily do in your case, make contact with us at any time. We glance forward to developing superior and long-term organization interactions along with you.
China Wholesale Cold Heading Mould Manufacturers - Protective Sheath Built up Die – Nisun Detail:

Nut size: M2-M48
Nut Grade: 4.8/ 5.6/ 8.8/ 10.9/ or as request
Heat treatment: Tempering, Hardening, Spheroidizing, Stress Relieving
Surface treatment: Plain, black finished, Zinc plated (Galv), Hot Dip Galvanized, Nickel, phosphate black,DACROMET coating, etc.
 

 

Material:

 

 

Carbon steel(,Q235,C1010,C1020,C1040.C1045,10b21,etc.)
stainless steel (SUS304 SUS316,A2-70,A4-70,A4-80)
Brass/copper(H62,H65,H68,etc.
Technology CAD, CAM, WEDM, CNC,Vacuum heat treatment,2.5-Dimensional Testing (projector),Hardness tester,etc. (HRC/HV)
Inspection equipment: Hardness test, torque test, salt spary endurance test, mechanical sizes test,ROHS report Mill test certification and etc as per your need.
Appearance: clear shiny surface, with complete neat body, without burrs and sharps.
Lead time: 12-20 days.
Sample lead time: 6-8 days are available.
Application: Widely used in machinery and electronics industry, automotive industry,construction industry, furniture industry, etc.

1. Q:What do you need to provide a quote?
A: Please kindly send us the drawing or sample of your product. Details below should be included:
1.Materials   2. Surface Finish
3. Tolerance   4. Quantity  5.other special requirements

2. Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

3. Q: Do you provide samples ? Is it free or extra ?
A: Yes, we are honored to offer you samples or raw material for quality inspection, but you need to bear the cost of freight.

4. Q:What will you do for after sales?
A:When our XXX’s apply to your products, we will follow up and await your feedback. Any question related to our products, our experienced engineers are ready to help.

5. How do you pack your letterbox?
We adopt standard export package,cartons or boxes,also can pack it by your requirement.

6. What’s your method of payment?
We accept payment by T/T, L/C .


Product detail pictures:


Related Product Guide:

Sticking for the belief of Creating items of top of the range and creating buddies with people today from all over the world, we normally put the interest of shoppers in the first place for China Wholesale Cold Heading Mould Manufacturers - Protective Sheath Built up Die – Nisun , The product will supply to all over the world, such as: South Korea, Croatia, Sheffield, With the intensified strength and more reliable credit, we are here to serve our customers by providing the highest quality and service, and we sincerely appreciate your support. We will endeavor to maintain our great reputation as the best products supplier in the world. If you have any questions or comments, please contact with us freely.
In general, we are satisfied with all aspects, cheap, high-quality, fast delivery and good procuct style, we will have follow-up cooperation!
5 Stars By Claire from The Swiss - 2018.06.03 10:17
We always believe that the details decides the company's product quality, in this respect, the company conform our requirements and the goods are meet our expectations.
5 Stars By Penelope from Sheffield - 2018.12.11 14:13
Write your message here and send it to us